Top rated - Chok Dee #1 |
Unfinished Kitchen CounterThe counter showing the red bricks that will form the support structure and the wood framework which is temporarily used to support the counter pour. dozer (0 votes)
|
|
Archway SupportThe start of the archway support structure. There will be concrete poured in forms above the archway which is supported by a rebar framework welded to the roofing metal.dozer (0 votes)
|
|
Applying the Render Coat to the CounterThe render coat is applied to the counter, with exact sizes being maintained for the cabinet door openings. Great care is applied to make sure the corners are properly squared (a sign of a good workman).dozer (0 votes)
|
|
Primer Second CoatThe second coat of TOA outside primer is applied. This is one area where it doesn't pay to corner cut, although you can get by with a single coat of an inferior primer the paint job won't hold up as it will with premo paints.dozer (0 votes)
|
|
Ceiling FrameworkThe ceiling framework which will allow the drywall sheeting to be applied beneath. The aluminum composite material is supported by hanging strips affixed to the roofing substructure. dozer (0 votes)
|
|
Poured ArchwayA side image of the poured archway. The concrete is poured within a wood framework and supported by wood slats which extend to the ground.dozer (0 votes)
|
|
Exterior Perimeter WallHouse as it looked during finishing when the exterior perimeter wall was being built. Note the perimeter all columns will be poured around the wall sections (ie. not done first), which increases the strength of the wall joints.dozer (0 votes)
|
|
Ceiling Sanding PlasterHere the plaster is sanded so that the ceiling paint will adhere. The round spots are where the sheetrock gypsum board is screwed into the aluminum framework. The lines are where the joints are taped between pieces.dozer (0 votes)
|
|
Smoothing a Render CoatThis shows a broom being used to smooth an external render coat. The broom is used as the final step in the rendering process after the surface is smoothed with a sponge application.dozer (0 votes)
|
|
Kitchen CounterThe start of the kitchen counter. The counter supports are done using red brick and cement. Note the area to the left of the worker is plumbed for the kitchen sink.dozer (0 votes)
|
|
Kitchen CounterThe surface of the counter is applied with freshly mixed concrete (portland cement with addition of sand and small stone aggregate). The hole to the left is where the stainless steel sink will sit and the tube extruding from the counter is for the faucet.dozer (0 votes)
|
|
Decorative Glass BlocksThis shows the wood spacers used to maintain spacing with the decorative glass blocks, these are the vertical ones in the front of the house. The inside of the gap is reinforced (with rebar) concrete.dozer (0 votes)
|
|
219 files on 19 page(s) |
|
|
|
|
|