Top rated - Chok Dee #1 |

Ready Mix Pour of the FloorNote the consistency of the concrete. It should have just enough moisture to be able to work it and not be watery.
dozer     (0 votes)
|
|

Ground BeamThe ground beam which sits on top of the footings will be 45 centimeters high by 25 centimeters wide. This shows the metal rebar frame work which will be encased in concrete to make the ground beam.
dozer     (0 votes)
|
|

Ground Beam Frame sits on a FootingSince we are using load bearing (heavy) walls, appx. 5.5 pieces of the 12 mm rebar on average cover each section of the ground beam. This shows a T section of the ground beam metal frame sitting on concrete footing.
dozer     (0 votes)
|
|

12 mm SD 30 RebarClose up of the back corner of the metal ground beam frame with extra rebar support. The 12 mm rebar is SD 30.
dozer     (0 votes)
|
|

Ground Beam Exterior Wood FormForm wood is used on the outside to support the pour of the ground beam.
dozer     (0 votes)
|
|

Form workThis shows the nearly completed form work.dozer     (0 votes)
|
|

Beam Formwork after FillThis shows the foundation ready to have the ground beam poured. Cinderblocks have been used in the form work inside the house, form wood is used with supports on the exterior. dozer     (0 votes)
|
|

External Front Right ViewOn the sides of the house there are decorative glass blocks (a row two high) above the windows. The windows and doors will be of high grade aluminum. dozer     (0 votes)
|
|

Bathroom View 1The bathroom is 2m x 3m. There are colored glass blocks used in the shower and main part of the room. dozer     (0 votes)
|
|

External from Left Reardozer     (0 votes)
|
|

Great Room from Reardozer     (0 votes)
|
|

Kitchen from Entry WayNotice the simple two level ceiling and the open design of the kitchen area, separated only by the wall color and floor tiles. dozer     (0 votes)
|
|