Leveling Brick EnclosureLeveling the brick enclosure at the front right of the garden area. The enclosure protects the deep water well casing and pvc piping. There is a submerged pump at the bottom of the six inch borehole, which is secured via heavy duty electric wire + a rope safety. dozer     (0 votes)
|
|

Rebar Re Enforcement of LidThis shows the framework to support the top of the tank. The rebar used is 6 mm and is spaced about at 10 cm squares. The blue PVC is where the water will enter the tank from the deep artesian pump, the yellow is the electric which will be routed to the electronic valve for the tank and the artesian pump.dozer     (0 votes)
|
|

Plumbing from the TankThe plumbing inbound water line from the tank. It feeds the house and exterior garden faucets. dozer     (0 votes)
|
|

Tank Seepage TestThe underground tank was tested as to its water proof-ness. The water was allowed to set for 24 hours and no seepage was detected. dozer     (0 votes)
|
|

Block Formwork for TankThe cinder blocks are used as form work for the walls of the tank which are re enforced with rebar. dozer     (0 votes)
|
|

Starting to Dig the Water TankThe underground water tank will be appx. 2 meters long by .7 meters wide by 1 meter deep for a capacity of about 1400 liters. An underground water tank has a durability + no loss of space advantage over a above ground tank. However care must be taken to make sure that they are leak proof.dozer     (0 votes)
|
|

Plumbing Lines for Bathroom SinkThe inbound and outbound water pipes for the bathroom sink. The lines are mounted within the wall under a horizontal ring beam.dozer     (0 votes)
|
|

Plumbing Lines for Bathroom SinkInbound and outbound water lines for the bathroom sink. dozer     (0 votes)
|
|

Support Column for Safety TankThis shows a support column which will be used below at 15 cm. footing which covers the entire lower portion of the hole. dozer     (0 votes)
|
|

Grease TrapA large grease trap will be plumbed in to accept the kitchen sink run off. The trap can be opened and emptied, as the name implies it catches solids which come down through the sink. dozer     (0 votes)
|
|

Safety TankDosch brand 1000 liter safety tank. This type of septic is required in higher population areas. They are a lot of work to install. The are supported by two support columns and a poured foundation. The support is necessary to prevent any settling due to weight.