Construction Photos
Home > House Construction > Chok Dee #1

Top rated - Chok Dee #1
IMG_3793.JPG
Power Point OpeningAn opening for a 4 receptacle power point in a designated empty hole within the load bearing wall.
dozer55555
(1 votes)
IMG_4703.jpg
Top of Tank FinishingHere the concrete is being poured and finished on top of the tank. It is thick enough to support a motorcycle + car. dozer55555
(1 votes)
IMG_4258.jpg
ShowerThe shower, which will be in the corner, has hot and cold piping, the reddish pipe is for hot water.dozer55555
(1 votes)
IMG_4200.JPG
Visual Roof InspectionAs long as there is none of the foil insulation which adheres to, and is installed at the same time the cement tiles are installed, the roof can be inspected visually during rain storms for leaks. If the foil has been applied any roof leaks will be much harder to find and repair. dozer55555
(1 votes)
IMG_4187.JPG
Render BrushThe brush is used during the render application to sprinkle water on the render as it is starting to dry, then it is polished with a cement trowel.dozer55555
(1 votes)
IMG_3542.JPG
CPAC Pour of Ground BeamsCPAC ready mix cement pour of ground beams. 280 KSC (kilometers per square centimeter) concrete was used as in the floor. CPAC is better than hand mix for large areas since it is poured as a homogeneous unit.
dozer55555
(1 votes)
IMG_3353.JPG
Footing HoleA footing hole with metal frame work. Each hole was 1 meter square by about 40 cm. deep. In this design there are only two foundation columns in the patio. Throughout the rest of the house there are footing and then a ground beam on top of the footings. The walls are load bearing with columns inside the wall material itself.
dozer55555
(1 votes)
IMG_3463.JPG
Ground Beam Rebar FrameThe rebar framework to support the ground beam.
dozer55555
(1 votes)
0803040842ExtFrontFromLeft.jpg
External From Front LeftThe roof is a 28% angle. This particular house will be 84 square meters inside, although it looks bigger.dozer55555
(1 votes)
0802221236BathRShSidei95_.jpg
Bathroom View 2Notice the two level ceiling which adds a bit of depth to the roomdozer55555
(2 votes)
IMG_3971~0.JPG
Location of Electrical Breaker PanelThis is the front right side of the house as you go in through the front door. Note the cluster of yellow PVC electrical conduit to the right of the glass blocks. This is where the electric breaker panel will be located.dozer44444
(1 votes)
IMG_3810.JPG
Power Point BoxThe power point box secured in place with cement.
dozer44444
(1 votes)