Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Top rated - Original Coolthaihouse Build
DSC03003.jpg
Hand mixing concrete for the carport pour. (18-May-04)dozer00000
(0 votes)
DSC03002.jpg
The carport pour is 20 centimeters thick.dozer00000
(0 votes)
DSC01120.jpg
Great room nearly complete.dozer00000
(0 votes)
DSC01105.jpg
Pour close up. (21-Apr-04)dozer00000
(0 votes)
DSC01104.jpg
Pour in the great room in progress.dozer00000
(0 votes)
DSC01103.jpg
The still wet surface is 'roughed' in preparation for tiling. (20-Apr-04)dozer00000
(0 votes)
DSC01101.jpg
A tile mesh pattern is created above the sand flooring.dozer00000
(0 votes)
DSC01090.jpg
Roughed surface.dozer00000
(0 votes)
DSC01089.jpg
A stick is used to designate the height of the pour. Here we used a height of 7 centimeters for the pour (allowing 3 centimeter for the tile).dozer00000
(0 votes)
DSC01088.jpg
To prepare for the pour metal rebar (gauge 2 hun) is hand tied into a mesh pattern. (20-Apr-04)dozer00000
(0 votes)
DSC01087.jpg
Pour in progress in the front bedroom.dozer00000
(0 votes)
DSC00101.jpg
This shows most of the foundation columns as well as the partially finished roof truss. (13-Mar-04)dozer00000