|

Top rated - Original Coolthaihouse Build |

Starting to frame a bedroom door. A piece of 2 * 4 is used to keep the door in place.dozer     (0 votes)
|
|

Front door of house framed. There is a cement base above the door frame. (22-Mar-04)dozer     (0 votes)
|
|

Two windows framed. There is a 'leveled' cement base below the window frame and bricks are being used to level the wall to be even with the top of the frame. (13-Mar-04)dozer     (0 votes)
|
|

Finished roof, view from rear.dozer     (0 votes)
|
|

Finished roof, view from right front.dozer     (0 votes)
|
|

Finished roof, view from right front.dozer     (0 votes)
|
|

This is the final fix to the valley on the right side of the house. Added flashing material is being added. (30-Jun-04)dozer     (0 votes)
|
|

For comparisons sake, a pair of photos of another house, which shows a wide strip of aluminum flashing (about 1 meter wide) being used which is a better way to do the roof flashing. (15-May-04/09-May-04)dozer     (0 votes)
|
|

Patio roof section along in foreground. (10-May-04)dozer     (0 votes)
|
|

Plastic inserts like these come in easy to install strips, each piece covering 3 sections (like the one shown). The are used to prevent birds and rodents from entering the attic area. (09-May-04)dozer     (0 votes)
|
|

For comparisons sake, a pair of photos of another house, which shows a wide strip of aluminum flashing (about 1 meter wide) being used which is a better way to do the roof flashing. (15-May-04/09-May-04)dozer     (0 votes)
|
|

A supplemental support beam was added to the roof section over the driveway. (08-May-04)dozer     (0 votes)
|
|
420 files on 35 page(s) |
 |
 |
 |
 |
 |
28 |  |
 |
 |
 |
|

|
|
|