happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Top rated - Original Coolthaihouse Build
DSC04047.jpg
A close up of the top and bottom sliding hinge used throughout. I think these look better than the side mounted hinges. (19-Jun-04)dozer00000
(0 votes)
DSC04039.jpg
The windows being prepared for the top and bottom hinges. (18-Jun-04)dozer00000
(0 votes)
DSC02134.jpg
This cabinet door shows the use of anchor nails. Anchor nails are inserted at about 10 centimeter intervals and will be used as a strengthening anchor to the frame of the surrounding wall surface. (13-May-04)dozer00000
(0 votes)
DSC01106.jpg
A close up of a clear block. There is one centimeter of cement used between the blocks. (21-Apr-04)dozer00000
(0 votes)
DSC01056~0.jpg
This shows the frame after stucco has been partially applied. (17-Apr-04)dozer00000
(0 votes)
DSC01039.jpg
This shows a repair job on the clear glass bricks installed in the large bathroom. The first go round there was not any cement used between the bricks. (09-Apr-04)dozer00000
(0 votes)
DSC00153.jpg
An embedded anchor nail. These nails are put in the door frame at regular intervals (about 15 centimeters apart) and used to anchor the frame to the wall.dozer00000
(0 votes)
DSC00152~0.jpg
Rear door being repaired. The first time the door was framed without using anchor nails and had to be redone. It is in the process of be reframed. (02-Apr-04)dozer00000
(0 votes)
DSC00139.jpg
Rear door framed and the side design of clear blocks. This side of clear blocks turned out to be poor placement, as when the door is open it blocks the light.dozer00000
(0 votes)
DSC00138.jpg
Bathroom window framed. Notice the cement base below the window and the use of red brick above.dozer00000
(0 votes)
DSC00136.jpg
Bathroom door being framed. This was a repair job. dozer00000
(0 votes)
DSC00131.jpg
These window frames show the how a cement base is placed above and below the window frame, and how the red bricks are used to level out the wall above the window. (28-Mar-04)dozer00000
(0 votes)
420 files on 35 page(s) 27

Debug Info 
Debug Output: show / hide