happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Top rated - Original Coolthaihouse Build
DSC02060.jpg
A completed but unpainted section on the back part of the house. (05-May-04)dozer00000
(0 votes)
DSC02054.jpg
A partially enclosed section on the back part of the house.dozer00000
(0 votes)
DSC02048.jpg
The grc sheeting is applied in sections like this. Separating the grc sheeting is a decorative wood strip. (03-May-04)dozer00000
(0 votes)
DSC02036.jpg
Wood framework. (02-May-04)dozer00000
(0 votes)
DSC01155.jpg
Building the wood framework. (24-Apr-04)dozer00000
(0 votes)
DSC04035~0.jpg
Finished ceiling section. (18-Jun-04)dozer00000
(0 votes)
DSC04033.jpg
Finished ceiling showing down lighting and fan.dozer00000
(0 votes)
DSC04032.jpg
This type of down lighting snaps in place and is easier to install than less expensive types. (17-Jun-04)dozer00000
(0 votes)
DSC04005.jpg
Ceiling after taping complete.dozer00000
(0 votes)
DSC03168.jpg
Mixing up a bucket of taping cement.dozer00000
(0 votes)
DSC03165.jpg
Taping the sheetrock seams. (07-Jun-04)dozer00000
(0 votes)
DSC03010.jpg
Electric conduit will lay on top of the metal support structure. (18-May-04)dozer00000
(0 votes)
420 files on 35 page(s) 16

Debug Info 
Debug Output: show / hide