DSC02160.jpg
The cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozer00000
(0 votes)
DSC02159.jpg
This shows the opening formed for the exhaust fan. The opening is framed made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozer00000
(0 votes)
DSC02152.jpg
This shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozer00000
(0 votes)
DSC02146.jpg
This shows a relatively think layer of stucco is applied.dozer00000
(0 votes)
DSC02139.jpg
Here stucco has been affixed.dozer00000
(0 votes)
DSC02137~0.jpg
Each cabinet section has a wood door. dozer00000
(0 votes)
DSC02136.jpg
A counter section after the red brick enclosure is complete. (14-May-04)dozer00000
(0 votes)
DSC02134~0.jpg
Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozer00000
(0 votes)
DSC02133.jpg
Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozer00000
(0 votes)
DSC02116.jpg
Partially finished counter with supporting brick columns.dozer00000
(0 votes)
DSC02113.jpg
The counter will be supported by red brick columns. (13-May-04)dozer00000
(0 votes)
DSC02009.jpg
The counter after the cement pour. (27-Apr-04)dozer00000
(0 votes)