happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Top rated - Original Coolthaihouse Build
DSC01130.jpg
A septic being dug. (22-Apr-04)dozer00000
(0 votes)
DSC00103.jpg
The small bathroom with 4" PVC for the toilet.dozer00000
(0 votes)
DSC00102.jpg
The framed small bathroom. (13-Mar-04)dozer00000
(0 votes)
DSC05158.jpg
The wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozer00000
(0 votes)
DSC05013.jpg
Finished cabinet section. The cabinet doors have been varnished with three coats of good quality wood varnish.dozer00000
(0 votes)
DSC05012.jpg
Finished cabinet section with stainless sink installed. (06-Jul-04)dozer00000
(0 votes)
DSC04045.jpg
Affixing grout to the tiles on the inside of the cabinets. (19-Jun-04)dozer00000
(0 votes)
DSC03072.jpg
Affixing grout to the kitchen floor tiles. (27-May-04)dozer00000
(0 votes)
DSC03066~0.jpg
Floor tiles. (26-May-04)dozer00000
(0 votes)
DSC03055.jpg
Partial wall tile completed. dozer00000
(0 votes)
DSC03049.jpg
The kitchen tile expert selecting tiles. (24-May-04)dozer00000
(0 votes)
DSC03025.jpg
A bit of repair in process. The tile on the front of the cabinet was not even with the door, so the tiles are being removed. More cement will be added to adjust the level. (21-May-04)dozer00000
(0 votes)
420 files on 35 page(s) 13

Debug Info 
Debug Output: show / hide