happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Top rated - Original Coolthaihouse Build
DSC03119.jpg
Small bathroom after the cement pour. The 4" PVC on the left is the toilet exhaust and the 3" on the right is the shower stall exhaust. (03-Jun-04)dozer00000
(0 votes)
DSC03114.jpg
The small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozer00000
(0 votes)
DSC03112.jpg
Small bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer00000
(0 votes)
DSC03111.jpg
This is the raw plumbing in the small bathroom, shown from the door opening counter clockwise. This shot shows the outside drain pipe (3" standing) along with the 2" sink runoff. The other PVC is the entry of hot and cold water.dozer00000
(0 votes)
DSC03110.jpg
The small bathroom sink plumbing, showing hot and cold water entry and water runoff. dozer00000
(0 votes)
DSC03109.jpg
Small bathroom hot and cold water for the shower stall.dozer00000
(0 votes)
DSC03108.jpg
The hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer00000
(0 votes)
DSC03102.jpg
The PVC drainage from the small bathroom for the water runoff. There are 3 exhaust pipes used for each bathroom. One is for the bathtub (or shower stall), one is for the sink and one is for the outside drain. The pipes are secured in place with a heavy cement. (01-Jun-04)dozer00000
(0 votes)
DSC03098.jpg
The 4" PVC is run into the toilet septic. The mallet is used to create the opening in the cement ring. (31-May-04)dozer00000
(0 votes)
DSC01137.jpg
Here is a cement ring is being put in place in one of the septics. (23-Apr-04)dozer00000
(0 votes)
DSC01132.jpg
The row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozer00000
(0 votes)
DSC01131~0.jpg
This shows the toilet septic for the small bathroom. In all there are 4 septic tanks, 2 for water runoff and 2 for toilets. There are 5 cement rings used for each one, the standard being 4. Each ring is 1.2 meters in diameter.dozer00000
(0 votes)
420 files on 35 page(s) 12