|
Top rated - Original Coolthaihouse Build |
Cabinet in progress in the large bathroom. (21-Jun-04)dozer (0 votes)
|
|
The sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer (0 votes)
|
|
Completed and tiled shower enclosure base. (20-Jun-04)dozer (0 votes)
|
|
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer (0 votes)
|
|
The plumber is applying tile grout. (14-Jun-04)dozer (0 votes)
|
|
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer (0 votes)
|
|
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozer (0 votes)
|
|
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozer (0 votes)
|
|
Large bathroom after cement has just been poured. (05-Jun-04)dozer (0 votes)
|
|
Water runoff pipes run into the septic like this. (05-Jun-04)dozer (0 votes)
|
|
The large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer (0 votes)
|
|
Large bathroom plumbing layout. On the left is the general water runoff PVC. On the right is the water entry, bathtub exhaust, toilet exhaust and finally the sink exhaust pipe.dozer (0 votes)
|
|
420 files on 35 page(s) |
|
|
|
|
|
11 | |
|
|
|
|
|
|
|