happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Top rated - Original Coolthaihouse Build
DSC04057.jpg
Cabinet in progress in the large bathroom. (21-Jun-04)dozer00000
(0 votes)
DSC04054.jpg
The sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer00000
(0 votes)
DSC04053.jpg
Completed and tiled shower enclosure base. (20-Jun-04)dozer00000
(0 votes)
DSC04043.jpg
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer00000
(0 votes)
DSC04021~0.jpg
The plumber is applying tile grout. (14-Jun-04)dozer00000
(0 votes)
DSC04011.jpg
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer00000
(0 votes)
DSC04006.jpg
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozer00000
(0 votes)
DSC03166~0.jpg
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozer00000
(0 votes)
DSC03155.jpg
Large bathroom after cement has just been poured. (05-Jun-04)dozer00000
(0 votes)
DSC03149.jpg
Water runoff pipes run into the septic like this. (05-Jun-04)dozer00000
(0 votes)
DSC03124.jpg
The large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer00000
(0 votes)
DSC03123.jpg
Large bathroom plumbing layout. On the left is the general water runoff PVC. On the right is the water entry, bathtub exhaust, toilet exhaust and finally the sink exhaust pipe.dozer00000
(0 votes)
420 files on 35 page(s) 11

Debug Info 
Debug Output: show / hide