happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance

Top rated - CTH Maintenance
IMG_3472.jpg
Electric: New FanA new Regene fan is being installed in the study to replace an old fan that wasn't working. dozer00000
(0 votes)
IMG_3467.jpg
New OutletsNet Bticino face plate and outlets. dozer00000
(0 votes)
IMG_3466.jpg
Electric: Original funky outletsThese were the original funky outlets installed throughout the house. There is inadequate space to use all of the individual outlets. dozer00000
(0 votes)
IMG_3338.jpg
Garbage CollectionEven the really good workers will tend to just toss the garbage over the wall if you don't watch them. dozer00000
(0 votes)
IMG_3335.jpg
Ceiling Service EntryThe installer finishes around the service entry area. dozer00000
(0 votes)
IMG_3332.jpg
Installing DrywallThe drywall we used was the premium moisture resistant Chang brand. Here it is being screwed into the support structure. dozer00000
(0 votes)
IMG_3331.jpg
Prefab OpeningThis is a prefabricated opening from Chang. Even through it is made of sheetrock it is more durable and holds up better than the home made variety. dozer00000
(0 votes)
IMG_3330.jpg
Ceiling StructureNew ceiling structure put in place. The original ceiling was done wrong with wire supports as opposed to the aluminum strips and had other problems. dozer00000
(0 votes)
IMG_3328.jpg
Ceiling LineThe red line shows the new straight line for the ceiling. dozer00000
(0 votes)
IMG_3326.jpg
Ceiling ReplacementThe existing ceiling was removed and a new straight line established for the new ceiling. dozer00000
(0 votes)
IMG_3322.jpg
Window MaintenancePainting the sill. The windows were also re chalked, shaved, sanded and in general made like new. dozer00000
(0 votes)
IMG_3321.jpg
Finished SillShowing the finished painted sill. dozer00000
(0 votes)
111 files on 10 page(s) 3

Debug Info 
Debug Output: show / hide