|
Top rated - CTH Maintenance |
Lower TrackOne undesirable thing during the install was they had to cut into the existing surface along the track to clear an area so that the new stainless track could be welding in place. dozer (0 votes)
|
|
Gate ArrivesThe stainless gate arrives a few weeks behind schedule, but arrives no the less!!dozer (0 votes)
|
|
Old GateThis gate was really heavy, maybe 200kg or more. It opened OK without too much effort due to stainless wheels, but was due for an upgrade.dozer (0 votes)
|
|
|
111 files on 10 page(s) |
|
|
|
|
|
|
|
10 |
|
|
|
|