happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance

Top rated - Renovations and Maintenance
KTFinishedView.youtube
Walkthrough of Finished CondoA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozer00000
(0 votes)
KSams-0052.jpg
Grout LineThe scissors show that there is no residual concrete in the grout line (prior to grouting) when the tiles are laid in dry pack manner.dozer00000
(0 votes)
KSams-0046.jpg
Tool for Applying a FittingThis type of tool is needed to slightly enlarge the opening prior to attaching a compression fitting. dozer00000
(0 votes)
KSams-0045.jpg
Flexi Pipe CuttingThe flexi pipe must be cut with a proper pipe cutting tool to keep the edges smooth.dozer00000
(0 votes)
IMG_1041.jpg
Electric Outlet w Tele JackNew electric outlet with a telephone jack.dozer00000
(0 votes)
IMG_1038.jpg
Finished Floor SectionThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozer00000
(0 votes)
IMG_1034.jpg
Original BathrooomThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozer00000
(0 votes)
IMG_0921.jpg
Putty AppliedWall putty is applied to smooth the area where the new electric outlet is. dozer00000
(0 votes)
IMG_0913.jpg
Wall ImprefectionThe painter fixing a wall imperfection. dozer00000
(0 votes)
IMG_0900.jpg
Grouting the SkirtingGrouting the skirting and floor tiles. dozer00000
(0 votes)
IMG_0893.jpg
Grouted Tile SectionA completed and grouted section of tiles.dozer00000
(0 votes)
IMG_0890.jpg
Grounded ElectricA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozer00000
(0 votes)
192 files on 16 page(s) 5

Debug Info 
Debug Output: show / hide