|
Top rated - Renovations and Maintenance |
Preparing for New Control BoxPreparing the wiring for a new square D electrical panel.dozer (0 votes)
|
|
Electric in CeilingLaying in the electric in the ceiling area for the new lights, ceiling fan and water heater.dozer (0 votes)
|
|
FlintkoteStarting to flintkote the floor area. dozer (0 votes)
|
|
Laying in the PlumbingEstablishing the pluming for the new faucets, drain, electric water heater and washing machine. The orange flexi tubing will be used for the hot water piping.dozer (0 votes)
|
|
Removing Existing SinkThe above counter mount sink was removed and this granite counter will be removed.dozer (0 votes)
|
|
Existing Above Ceiling AreaThese pipes in the ceiling area are from the condo above. dozer (0 votes)
|
|
Tile RemovalThe tile removal took longer than anticipated.dozer (0 votes)
|
|
Don't Buy a ToiletDon't buy the toilet first until checking the the distance between the center of the waste hole and the wall (yes, we knew that, especially since we heard of others having the problem).dozer (0 votes)
|
|
Original Kitchen GraniteThe kitchen granite counter will stay, our job was to try to match it as close as possible at the granite factory.dozer (0 votes)
|
|
Original View BathtubThis bathtub was leaking and needed to be either replaced with another tub or as we decided a shower enclosure.dozer (0 votes)
|
|
Original View ToiletThe original view of the toilet and stained tile area.dozer (0 votes)
|
|
Water HeaterA new Stiebel water heater was installed along with a VRH stainless shower head. dozer (0 votes)
|
|
192 files on 16 page(s) |
|
|
4 | |
|
|
|
|
|
|
|
|
|
|