happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance

Top rated - Renovations and Maintenance
IMG_2438.jpg
ScrapThe part cut off, to be sold for scrap.dozer00000
(0 votes)
IMG_2436.jpg
Metal ToppedThe top of the metal was cut off, here it is being smoothed. dozer00000
(0 votes)
DSC05123.jpg
Original Wall with MetalAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer00000
(0 votes)
DSC05120.jpg
Original View of Front WallThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer00000
(0 votes)
IMG_2891.jpg
Prep WorkThe top concrete layer had already been removed, here is some of the dirt dug in prep for pouring concrete. Forms are starting to be positioned. dozer00000
(0 votes)
DSC05052.jpg
Original WellThe stone aggregate (used to line the line the well) footprint was eventually concreted over. dozer00000
(0 votes)
IMG_2910.jpg
Troweling the SurfaceThe finished surface of the upper level of the pour with concrete all around the well. dozer00000
(0 votes)
IMG_2892.jpg
Forming Sealing LayerThe forms and rebar are set in place to pour the upper level of concrete. The gutter is poured separately. dozer00000
(0 votes)
IMG_2883.jpg
Forming GutterThe gutter will run along the exterior of the wall. Here rebar is placed to form the gutter. dozer00000
(0 votes)
IMG_2881.jpg
Rerouted ElectricalSome electrical that ran encased in concrete prior needed to be re-routed. Add one to the reasons over time I don't like encasing anything in concrete. 1 commentsdozer00000
(0 votes)
IMG_2875.jpg
Concrete RemovedAll of the old top concrete layer was busted out and removed.dozer00000
(0 votes)
DSC01887.jpg
Original CrackThe original crack which was filled using wall putty a couple of time but kept re-appearing. dozer00000
(0 votes)
192 files on 16 page(s) 14

Debug Info 
Debug Output: show / hide