Top rated - Renovations and Maintenance |
ScrapThe part cut off, to be sold for scrap.dozer (0 votes)
|
|
Metal ToppedThe top of the metal was cut off, here it is being smoothed. dozer (0 votes)
|
|
Original Wall with MetalAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer (0 votes)
|
|
Original View of Front WallThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer (0 votes)
|
|
Prep WorkThe top concrete layer had already been removed, here is some of the dirt dug in prep for pouring concrete. Forms are starting to be positioned. dozer (0 votes)
|
|
Original WellThe stone aggregate (used to line the line the well) footprint was eventually concreted over. dozer (0 votes)
|
|
Troweling the SurfaceThe finished surface of the upper level of the pour with concrete all around the well. dozer (0 votes)
|
|
Forming Sealing LayerThe forms and rebar are set in place to pour the upper level of concrete. The gutter is poured separately. dozer (0 votes)
|
|
Forming GutterThe gutter will run along the exterior of the wall. Here rebar is placed to form the gutter. dozer (0 votes)
|
|
Rerouted ElectricalSome electrical that ran encased in concrete prior needed to be re-routed. Add one to the reasons over time I don't like encasing anything in concrete. dozer (0 votes)
|
|
Concrete RemovedAll of the old top concrete layer was busted out and removed.dozer (0 votes)
|
|
Original CrackThe original crack which was filled using wall putty a couple of time but kept re-appearing. dozer (0 votes)
|
|
192 files on 16 page(s) |
|
|
|
|
|
|
|
|
14 | |
|
|
|
|