happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance

Top rated - Renovations and Maintenance
IMG_2594.jpg
Security Metal affixed to Top of WallThis security metal was fabricated here and then attached via anchor bolts. dozer00000
(0 votes)
IMG_2567.jpg
Column LightingElectrician preparing to install the lighting on the top of each column. dozer00000
(0 votes)
IMG_2547.jpg
Another ColumnElectric conduit extends through the top and has been taped. Note the new bricks used to top up the column are the nice decorative ones (3.5 b each) which look much nicer than the ones on the bottom. dozer00000
(0 votes)
IMG_2534.jpg
Columns are RaisedThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozer00000
(0 votes)
IMG_2518.jpg
Close up of the finished beamdozer00000
(0 votes)
IMG_2517.jpg
Smoothing the Underside of the Beamdozer00000
(0 votes)
IMG_2475.jpg
Edging the Upper BeamAfter the beam has set now it is being cornered. dozer00000
(0 votes)
IMG_2451.jpg
Fabricating Security MetalThe security metal will be bolted on top of the finished wall. dozer00000
(0 votes)
IMG_2450.jpg
Electric to Extrude through ColumnsThe level of the original electric will be raised since the columns is being extended upwards.dozer00000
(0 votes)
IMG_2447.jpg
Ribs being Attached to FrameThe lateral support members are wired in place each 20 centimeters. dozer00000
(0 votes)
IMG_2446.jpg
Formworkdozer00000
(0 votes)
IMG_2444.jpg
Form Work and Rebar FrameThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozer00000
(0 votes)
192 files on 16 page(s) 13

Debug Info 
Debug Output: show / hide