Form Work for Upper BeamThe form work for the upper beam is being put in place.dozer00000
(0 votes)
IMG_1315.jpg
Column ExtensionThe column extensions were poured around the cinder blocks. dozer00000
(0 votes)
IMG_1314.jpg
Rebar FrameThe original column was chiseled down to the existing rebar and the new frame was welded to it. dozer00000
(0 votes)
IMG_1307.jpg
New Cinder BlocksThe new cinder blocks are laid in place. Lateral rebar supports are drilled into the existing column to help hold the cinderblocks in place. dozer00000
(0 votes)
IMG_1305.jpg
WeldA weld of new rebar to old rebar. dozer00000
(0 votes)
IMG_1304.jpg
Prep WorkThe metal being before to hold the security metal in place (which is anchor bolted to the column) will be used to secure rebar for lateral strength. dozer00000
(0 votes)
IMG_1303.jpg
RebarShows how the rebar was affixed laterally and vertically for the modification. dozer00000
(0 votes)
IMG_1302.jpg
RebarIn addition to these lateral rebars which were attached to the existing metal, there were some place by drilling into the existing column. dozer00000
(0 votes)
IMG_1301.jpg
Old MetalThe old metal being prepared for the scrap man at 10 b per kilo. dozer00000
(0 votes)
DSC05124.jpg
Original WallThe original side wall being raised. dozer00000
(0 votes)
DSC05126.jpg
Pump HouseThe original pump house with raw water filtration (from a hand dug well) and single pump. The corrugated roof tiles are also visible with the extruding screws. dozer00000
(0 votes)
IMG_3804.jpg
dozer00000
(0 votes)