happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details

Top rated - Details
DSC02137~0.jpg
Each cabinet section has a wood door. dozer00000
(0 votes)
DSC02136.jpg
A counter section after the red brick enclosure is complete. (14-May-04)dozer00000
(0 votes)
DSC02134~0.jpg
Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozer00000
(0 votes)
DSC02133.jpg
Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozer00000
(0 votes)
DSC02116.jpg
Partially finished counter with supporting brick columns.dozer00000
(0 votes)
DSC02113.jpg
The counter will be supported by red brick columns. (13-May-04)dozer00000
(0 votes)
DSC02009.jpg
The counter after the cement pour. (27-Apr-04)dozer00000
(0 votes)
DSC02008.jpg
Pouring cement to form the counter.dozer00000
(0 votes)
DSC02002.jpg
The red bricks designate where the sink will go. dozer00000
(0 votes)
DSC02001.jpg
The metal for the kitchen counter is secured on top of some grc sheeting material and drilled into the wall prior to pouring cement. (26-Apr-04)dozer00000
(0 votes)
DSC06003.jpg
The completed section over the carport. (28-Aug-04)dozer00000
(0 votes)
DSC05037.jpg
A completed and painted section in the rear of the house. (08-Jul-04)dozer00000
(0 votes)
122 files on 11 page(s) 8

Debug Info 
Debug Output: show / hide