happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details

Top rated - Details
DSC03109.jpg
Small bathroom hot and cold water for the shower stall.dozer00000
(0 votes)
DSC03108.jpg
The hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer00000
(0 votes)
DSC03102.jpg
The PVC drainage from the small bathroom for the water runoff. There are 3 exhaust pipes used for each bathroom. One is for the bathtub (or shower stall), one is for the sink and one is for the outside drain. The pipes are secured in place with a heavy cement. (01-Jun-04)dozer00000
(0 votes)
DSC03098.jpg
The 4" PVC is run into the toilet septic. The mallet is used to create the opening in the cement ring. (31-May-04)dozer00000
(0 votes)
DSC01137.jpg
Here is a cement ring is being put in place in one of the septics. (23-Apr-04)dozer00000
(0 votes)
DSC01132.jpg
The row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozer00000
(0 votes)
DSC01131~0.jpg
This shows the toilet septic for the small bathroom. In all there are 4 septic tanks, 2 for water runoff and 2 for toilets. There are 5 cement rings used for each one, the standard being 4. Each ring is 1.2 meters in diameter.dozer00000
(0 votes)
DSC01130.jpg
A septic being dug. (22-Apr-04)dozer00000
(0 votes)
DSC00103.jpg
The small bathroom with 4" PVC for the toilet.dozer00000
(0 votes)
DSC00102.jpg
The framed small bathroom. (13-Mar-04)dozer00000
(0 votes)
DSC05158.jpg
The wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozer00000
(0 votes)
DSC05013.jpg
Finished cabinet section. The cabinet doors have been varnished with three coats of good quality wood varnish.dozer00000
(0 votes)
122 files on 11 page(s) 6

Debug Info 
Debug Output: show / hide