happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details

Top rated - Details
DSC04100.jpg
This is a critical piece of plumbing which is used under the bathtub. Without it, for one thing, foul smells can flow in through the bathtub from the water septic. (24-Jun-04)dozer00000
(0 votes)
DSC04084.jpg
The plumber finishing off the shower enclosure.dozer00000
(0 votes)
DSC04081.jpg
The top shows the heavy duty bathtub drain assembly which was purchased separately for about 1700 Baht. On lower portion shows the default drain assembly which comes with the bathtub. You wouldn't want to use this plastic type. (23-Jun-04)dozer00000
(0 votes)
DSC04073.jpg
Partially tiled sink enclosure in the small bathroom. (22-Jun-04)dozer00000
(0 votes)
DSC04063.jpg
The bathtub will be supported by this brick enclosure.dozer00000
(0 votes)
DSC04062.jpg
The large bathroom cabinet. dozer00000
(0 votes)
DSC04061.jpg
The 75 liter hot water heater which is mounted on the kitchen wall. This feeds hot water throughout the house.dozer00000
(0 votes)
DSC04057.jpg
Cabinet in progress in the large bathroom. (21-Jun-04)dozer00000
(0 votes)
DSC04054.jpg
The sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer00000
(0 votes)
DSC04053.jpg
Completed and tiled shower enclosure base. (20-Jun-04)dozer00000
(0 votes)
DSC04043.jpg
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer00000
(0 votes)
DSC04021~0.jpg
The plumber is applying tile grout. (14-Jun-04)dozer00000
(0 votes)
122 files on 11 page(s) 4

Debug Info 
Debug Output: show / hide