|
Top rated - Details |
This is a critical piece of plumbing which is used under the bathtub. Without it, for one thing, foul smells can flow in through the bathtub from the water septic. (24-Jun-04)dozer (0 votes)
|
|
The plumber finishing off the shower enclosure.dozer (0 votes)
|
|
The top shows the heavy duty bathtub drain assembly which was purchased separately for about 1700 Baht. On lower portion shows the default drain assembly which comes with the bathtub. You wouldn't want to use this plastic type. (23-Jun-04)dozer (0 votes)
|
|
Partially tiled sink enclosure in the small bathroom. (22-Jun-04)dozer (0 votes)
|
|
The bathtub will be supported by this brick enclosure.dozer (0 votes)
|
|
The large bathroom cabinet. dozer (0 votes)
|
|
The 75 liter hot water heater which is mounted on the kitchen wall. This feeds hot water throughout the house.dozer (0 votes)
|
|
Cabinet in progress in the large bathroom. (21-Jun-04)dozer (0 votes)
|
|
The sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer (0 votes)
|
|
Completed and tiled shower enclosure base. (20-Jun-04)dozer (0 votes)
|
|
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer (0 votes)
|
|
The plumber is applying tile grout. (14-Jun-04)dozer (0 votes)
|
|
122 files on 11 page(s) |
|
|
4 | |
|
|
|
|
|
|
|
|
|