happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > chiyman

Top rated - chiyman's Gallery
DSCF4962.JPG
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperatelychiyman00000
(0 votes)
DSCF4961.JPG
The waste from the downstairs toilet will be collected in this tank formed from precast concrete rings - this one is 4 rings deep.chiyman00000
(0 votes)
DSCF4972.JPG
Ground floor slab completed - the part nearest the concrete mixer will be brushed once it has semi cured.chiyman00000
(0 votes)
DSCF4970.JPG
Everything ready for pouring the Ground floor slabchiyman00000
(0 votes)
DSCF4969.JPG
Note the reinfocement for the ground floor slab (mesh) was tied onto the ground beam reinforcement for extra strength.chiyman00000
(0 votes)
DSCF4968.JPG
placing pegs in the ground as a depth guide for the ground floor slabchiyman00000
(0 votes)
DSCF4966.JPG
Materials for construction of the column formworkchiyman00000
(0 votes)
DSCF4983.JPG
Pouring concrete into the column formwork - a highly manual process - effective though!!chiyman00000
(0 votes)
DSCF4978.JPG
A delivery of Yucca poles freshly cut which will be used later for the first floor constructionchiyman00000
(0 votes)
DSCF4975.JPG
Further ground floor to first floor column formwork constructionchiyman00000
(0 votes)
DSCF4974.JPG
Ground floor slab completed. starting to build the formwork for the Ground floor to first floor columnschiyman00000
(0 votes)
DSCF4973.JPG
Completed Ground slab brushed finish ready to accept floor tiling later onchiyman00000
(0 votes)
160 files on 14 page(s) 9

Debug Info 
Debug Output: show / hide