|
Top rated - chiyman's Gallery |
An evening meal washed down with plenty of Thai whisky at the end of a hard days work.chiyman (0 votes)
|
|
Ground floor slab formwork almost completed.chiyman (0 votes)
|
|
Ground floor slab reinforcement placed and tied into the ground floor beam steelwork.chiyman (0 votes)
|
|
Bathroom drainage connections placed befor pouring the ground floor slabchiyman (0 votes)
|
|
The connection pipe from the toilet to the collection tank.chiyman (0 votes)
|
|
Toild waste receptical and blue pipe which will discharge water from the shower and wash hand basin.chiyman (0 votes)
|
|
Ground floor Bathroom waste water pipework placed in position.chiyman (0 votes)
|
|
Ground slab formwork completed and ready for the pour. Concrete mixer, sand, stone and cement ready.chiyman (0 votes)
|
|
Ground slab formwork completed and ready for the pourchiyman (0 votes)
|
|
Groundfloor formwork completed. Our construction workers lived in the tent which can been seen in the picture. They considered this to be more "professional" than constructing their own temporary accommodation!!chiyman (0 votes)
|
|
Ground floor formwork completedchiyman (0 votes)
|
|
Ground floor formwork completedchiyman (0 votes)
|
|
160 files on 14 page(s) |
|
|
|
|
|
8 | |
|
|
|
|
|
|
|