Backfilling the footings the next daychiyman (0 votes)
Backfilling and cutting trench for the ground beams.chiyman (0 votes)
Getting everything straight and levelled before the big concrete pour.chiyman (0 votes)
Getting everything straight and levelled before the big concrete pour.chiyman (0 votes)
First of 3 Concrete truck arrives. Pour direct to the footing and also filling the concrete pipes which form the below ground section of the main building columns.chiyman (0 votes)
A happy constructor with a Pepsi!chiyman (0 votes)