|

Top rated - Max&Bee-in-CM's Gallery |

The (incompetent?) roof metal guy thinks about how to jack up the roofMaybe incompetent is too strong a word - but he was quick to assign blame to poor quality metal, bad architect, bad engineer, CPAC tiles too heavy, roof too big, etc - everyone except himself.Max&Bee-in-CM     (0 votes)
|
|

Jacking up the sagging beamA few car jacks were used to straighten out the sagging beams, before the truss structure was welded into placeMax&Bee-in-CM     (0 votes)
|
|

House in limboWork on the concrete floor, walls, tiles cannot continue as we do repairs to the roof metalMax&Bee-in-CM     (0 votes)
|
|

Repairing the roofThe roof structure is being converted into a truss systemMax&Bee-in-CM     (0 votes)
|
|
|
|
|

Tile installation stops before the front is finished to begin repair work on the saggingMax&Bee-in-CM     (0 votes)
|
|

The metal beams begin to sag under the weight of the tilesMax&Bee-in-CM     (0 votes)
|
|
|
|
|
307 files on 26 page(s) |
 |
 |
 |
5 |  |
 |
 |
 |
 |
 |
|

|
|
|