|

Top rated - Max&Bee-in-CM's Gallery |

Last day working on the roof metal - finishing touchesMaking all the welds stronger and painting the jointsMax&Bee-in-CM     (0 votes)
|
|
|

Last day working on the roof metal - finishing touchesMax&Bee-in-CM     (0 votes)
|
|
|
|

Bottom of T support beamWe cut to size of 20cm x 20cm the 1 inch thick steel, to form the base of the T beam. It is located on top of a ground beam, so will not puncture through the concrete.Max&Bee-in-CM     (0 votes)
|
|

The T support beam holding up the roof at the topMax&Bee-in-CM     (0 votes)
|
|

Support for beamWe needed to make a large foundation for the support of the beams helping to hold up the roof, as there is no ground beam under this point. Max&Bee-in-CM     (0 votes)
|
|

Welding the support columnTwo steel beams (22kg) are welded in a T bar configuration to help support the roofMax&Bee-in-CM     (0 votes)
|
|

Floor structure for support columnThis one is in the master bathroom, embedded in the double wallMax&Bee-in-CM     (0 votes)
|
|

Permanent support column is welded into placeThis one helps to hold the roof up in the master bathroomMax&Bee-in-CM     (0 votes)
|
|
|
307 files on 26 page(s) |
 |
3 |  |
 |
 |
 |
 |
 |
 |
 |
|

|
|
|