Top rated - Max&Bee-in-CM's Gallery |
Measure land infill heightUsing a water tube, the height of the soil infill is measured. It should be 50 cm, but it was found to vary between 25 and 40 cm. Hence the soil man was told to fill to the agreed level of 50 cm, and not beat around the bush, by saying the land is uneven in places. Payment is being withheld until 50 cm is achieved on the whole land.
The agreement was verbal - next time everything will be in writing - lesson learnt - don't trust anyone.Max&Bee-in-CM (1 votes)
|
|
Surpervising the projectWe are at site daily to supervise the work.Max&Bee-in-CM (1 votes)
|
|
Bending the rebarThe lady bends the rebar while her 2 daughters look on.Max&Bee-in-CM (1 votes)
|
|
Efficient workerOur best worker on site, small but really really fast.Max&Bee-in-CM (1 votes)
|
|
|
Digging foundation holesThe macro man hard at work.Max&Bee-in-CM (1 votes)
|
|
Found the pipesConcrete pipes are needed in order to build a pier to mount the telescope. Appropriate concrete pipes were found at the local cement/pip shop. Each pipe is 1 metre long, with an inside diameter of 28 cm. Cost per pipe is 280 baht. I bought 3, and the delivery van followed us to site.Max&Bee-in-CM (1 votes)
|
|
check the layoutcheck, double check and triple check the layoutMax&Bee-in-CM (1 votes)
|
|
beaten up truckthats has got to be one of the most beaten up trucks i have ever seen.Max&Bee-in-CM (1 votes)
|
|
First delivery of cementThe first delivery of rebar and some concrete mix to site.
The "macro" is in the background ready to dig.Max&Bee-in-CM (1 votes)
|
|
clean waterwe have clean water, after a day of muddy waterMax&Bee-in-CM (2 votes)
|
|
Last day working on the roof metal - finishing touchesMaking the welds strongerMax&Bee-in-CM (0 votes)
|
|