|

Top rated - Max&Bee-in-CM's Gallery |

Toilet, bathroom and bedroomLooking at the toilet in the front of the picture, the bathroom on the right, and the small bedroom next to it on the left.Max&Bee-in-CM     (0 votes)
|
|

The meals areaLooking at the meals area at the rear left of the house.Max&Bee-in-CM     (0 votes)
|
|

A cross connectA cross connect for the rebar. I like how they bend the rebar to squeeze it inside the column.Max&Bee-in-CM     (0 votes)
|
|
|

View from the entrance corridorStanding just inside the entrance, on the left is the master bedroom.Max&Bee-in-CM     (0 votes)
|
|

Master bedroomAnther view of the master bedroom rebar ground beam, being held up by a stick as we didnt get enough soil infill.Max&Bee-in-CM     (0 votes)
|
|

Right angle rebarCloseup of the rebar work for the right corner of the house, the study room.Max&Bee-in-CM     (0 votes)
|
|

Front right cornerLooking at the front right of the house, from the study room to the master bedroom.Max&Bee-in-CM     (0 votes)
|
|

Master bedroomThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CM     (0 votes)
|
|

LaundryThe rebar for the ground beams of the laundryMax&Bee-in-CM     (0 votes)
|
|

The fence posts shopThe friendly staff at the shop. We bought 100 posts, 3 meters in height for 160 baht each. Paid 8,000 baht deposit, and the balance of 8,000 baht 2 days later once the posts were ready for delivery. The shop is a full family operation, with mum and dad and the 2 kids running it.Max&Bee-in-CM     (0 votes)
|
|

Escorting the truckThe shop is about 15 km from the land, so we had to take them, as its quite difficult to describe the exact location.Max&Bee-in-CM     (0 votes)
|
|
307 files on 26 page(s) |
 |
 |
 |
 |
 |
14 |  |
 |
 |
 |
|

|
|
|