happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Basics

Top rated - Basics
DSC02079.jpg
A supplemental support beam was added to the roof section over the driveway. (08-May-04)dozer00000
(0 votes)
DSC02046.jpg
Repaired roof valley. dozer00000
(0 votes)
DSC02033.jpg
Repair work on valley in progress.dozer00000
(0 votes)
DSC02032.jpg
Close up of valley problem area. dozer00000
(0 votes)
DSC02031.jpg
Front valley looks pretty poor after the first try. This will need to be reworked since the tiles do not come together in a nice clean straight cut line. dozer00000
(0 votes)
DSC02030.jpg
Front valley being completed. (30-Apr-04) dozer00000
(0 votes)
DSC02023.jpg
This shows the patch done on the inside of the roof valley but it is a little hard to see. Basically instead of one piece of aluminum an additional piece was added on top which sets on top of the 1 * 1 cross supports. The whole idea here is to add more angle and prevent any water entry during a rainy storm with high winds. (29-Apr-04)dozer00000
(0 votes)
DSC02019.jpg
The tile is laid over aluminium drainage sheets in the valley section. dozer00000
(0 votes)
DSC02018.jpg
Working on the front roof valley of the house. (28-Apr-04)dozer00000
(0 votes)
DSC02013.jpg
Close-up of underside of roof section. dozer00000
(0 votes)
DSC02012.jpg
Main roof section nearing completion. (27-Apr-04)dozer00000
(0 votes)
DSC02004.jpg
Cement work on the roof tiles. (26-Apr-04)dozer00000
(0 votes)
133 files on 12 page(s) 5