P2031737.JPG
3 Feb 2009Carrying the panels from the stack to the house floor takes 4 Thai men and some sweat. They only have about 60 more to go.pklongball00000
(0 votes)
P2031738.JPG
3 Feb 2009A little push here and a grunt there and the concrete panel gets moved into position. No high tech machines here just plenty of grunt workpklongball00000
(0 votes)
P2031740.JPG
3 Feb 2009Moving another panel into positionpklongball00000
(0 votes)
P2031741.JPG
3 Feb 2009This is how they do it on my house. Plenty of manual laborpklongball00000
(0 votes)
P1291734.JPG
29 Jan. 2009So here we are at the end of day on the 29th. Insect system installed and 10 columns poured along with the delivery of the floor panels. All in all a good week of progress on the Phala House. Stay tuned for more.pklongball00000
(0 votes)
P1291720.JPG
29 Jan. 2009Overview of Mr. Termite spraying the ground under the house. This first application of termite chemical will be followed with another using the tubing system just after house completion and then every six months after. The current contract is for 3 years.pklongball00000
(0 votes)
P1291722.JPG
29 Jan. 2009Just another view of the final result of the tubing install and some debris that will be removed before the floor goes in place1 commentspklongball00000
(0 votes)
P1291724.JPG
29 Jan. 2009View just after the install of the tubing. A first application of the chemical was applied using a high pressure sprayer.pklongball00000
(0 votes)
P1291725.JPG
29 Jan. 2009The install called for the Termite Team to install 10 zones of tubing. The zones were divided into 4 exit points around the foundation. If these look long , they are intending to be cut to a proper length when the final finish is applied to the wall.pklongball00000
(0 votes)
P1291733.JPG
29 Jan. 2009This view shows the newly added black tubing that is part of a termite control system. Installed today.pklongball00000
(0 votes)
P1291715.JPG
29 Jan. 2009Overview of the site just after the first delivery of floor panels.pklongball00000
(0 votes)
P1291716.JPG
29 Jan. 2009The crew is taking a short break waiting for the next batch of concrete from the mixer.pklongball00000
(0 votes)