16 March 2009Soon this stack of tile will be on the roof.pklongball (0 votes)
17 March 2009Sparky and helper installing a pipe and boxpklongball (0 votes)
17 March 2009The wall building is interrupted to allow the electrician "Sparky" and helper to install the boxes and conduits for the plugs and switches inside the wall cavity. From now til the Sparky finishes this part they will work together. We can also see the roof crew is moving tiles to the roof area for installation.pklongball (0 votes)
16 March 2009The living room exterior wall where I hope to place the wide screen TVpklongball (0 votes)
16 March 2009Here we have the beginning of the long exterior kitchen wall. If all goes well this will have the cooktop, oven and micro along this length.pklongball (0 votes)
16 March 2009A wall begins. This wall happens to be the left wall of the storage room and the master bedroom doorway next to the column.pklongball (0 votes)
Overview 16 March 2009Another view and perspectivepklongball (0 votes)
Overview 16 March 2009Status of the build.pklongball (0 votes)
16 March 2009Two of the brick team building the brick around the columns for later renderingpklongball (0 votes)
Column brickworkDifferent view of the brick workpklongball (0 votes)
Column brickworkHere we have a lady mason and helper laying the outer bricks to a column for that finish laterpklongball (0 votes)
11 March 2009The outer kitchen wall up o the level needed for the lintel beam install. On a wall with no windows a beam will be built in about halfway up the height of the wall.pklongball (0 votes)