P3191889.JPG
19 March 2009Here we have the beginning of the wall between the kitchen and living room. We will end up with a countertop and pass thru window on both sides to allow getting beer and goodies to the living room.pklongball00000
(0 votes)
P3191880.JPG
19 March 2009This is one of 4 kids the wall man has. Typical young boy, school is out now and he wanted to be with dad to help him. I guess he got tuckered out and needed a nap.Normally the builder does not allow any kids on the job site except if the family has some issues.pklongball00000
(0 votes)
P3191881.JPG
19 March 2009I added this shot of this column to show a small problem we had in discussing the outdoor lights on the columns. Sparky had to chisel out the brick here and re-route the pvc to the outside of the column not the place he put it. Small but crucial to locate this decorative light on the correct side of the column. One of those confusion things when we were all talking and pointing where things should be placed.pklongball00000
(0 votes)
P3191882.JPG
19 March 2009The bedroom wall looking onto the rear patio area and it's prepared for the lintel. You can also see some of the pvc work for plugs and suchpklongball00000
(0 votes)
P3191883.JPG
19 March 2009Here we have a wall view of the master bedroom wall and preparations to make the concrete lintel. The method for any wall lintel is to shape the AAC blocks into small pieces and glue them into the cavity to allow poring of concrete for the beam.pklongball00000
(0 votes)
P3191884.JPG
19 March 2009Here we have a view of part of a wall and the pvc electric pipe install. This wall happens to be near the back of house that will have a window to look on the back yardpklongball00000
(0 votes)
P3191878.JPG
19 March 2009This is a front view at about 4 in the afternoon. The roof tile crew did a nice days work.pklongball00000
(0 votes)
P3191879.JPG
19 March 2009So we had a good bit of work on the tile today. I would say about 3 days should get the majority of tile in place.pklongball00000
(0 votes)
P3171875.JPG
17 March 2009The wall work, roof tile work and electric pipe work all going on at the same time.pklongball00000
(0 votes)
P3171876.JPG
17 March 2009The view today March 17. happy St Patty's Daypklongball00000
(0 votes)
P3161870.JPG
16 March 2009Here we are looking from the master bedroom entry door into what will be the dressing area of the master bedroom.pklongball00000
(0 votes)
P3161871.JPG
16 March 2009The very early stage of the wall build. This view is from the master bedroom looking through what will be a window across the balcony to the kitchen door.pklongball00000
(0 votes)