28 AprilThe labor crew hand dug this trench around the property perimeter from the septic tank. A series of pipe and boxes will be installed to drain the run out from the septic tank as well as the grey water from the showers and sinks and any water from rain on the land. Ends in the street sewer drainage system.pklongball (0 votes)
28 AprilOne 1600 liter tank for the two toilets should do the trick.pklongball (0 votes)
28 AprilNo real explanation here as this is a partially complete drain from the toilets.pklongball (0 votes)
28 AprilAt the same time as the ceiling crew arrived the waterman finally made a return and started his part of the job. Here we can see the now installed toilet pipes and the beginning of the shower and sinks drain linespklongball (0 votes)
28 AprilWe have some work starting on the gypsum ceiling. The crew came in today and started outside.pklongball (0 votes)
21 AprilThis is the view most visitors to the area will see when coming from the main entry of the projectpklongball (0 votes)
21 AprilBack view of the place as of todaypklongball (0 votes)
21 AprilNow some work has started on the back veranda stairway. A base layer of concrete was poured today.pklongball (0 votes)
21 AprilHere we have a gable now with all the Sherawood applied. The yellow color is the Shera unfinished out of the box color. We will paint it and the trim wood will get finish too.pklongball (0 votes)
18 AprilWhat else but another view of the gables. I guess some may think I'm obsessed with this but it cost a lot to build this roof and gables versus the traditional hip roof. A lot!pklongball (0 votes)
18 AprilA look at the plastered side and back wallspklongball (0 votes)
18 AprilFull view of the new door framepklongball (0 votes)