5 MayHere we have some of the completed work around the exterior soffits or eaves. Later we will add some ventilation ports.pklongball (0 votes)
5 MayView of the kitchen ceiling gridpklongball (0 votes)
5 MayHere we have one of the 2 half walls that will create the wet and dry areas for the master bath shower and toilet. This was just built in the last day or so.pklongball (0 votes)
5 MayMaster bedroom ceiling and some of the electric pipes and boxespklongball (0 votes)
5 MayAnother view of the newly pulled wire for the bedroom down lights and fanpklongball (0 votes)
5 MayNot sure if you can pick it up in this view but I am trying to show some electrical conduit and now wires for the ceiling drop lights and the fan. Sparky was here today before the ceiling gets closed up on him.pklongball (0 votes)
5 MayHere we have a view of the living room ceiling and the partly installed rock. This look is back towards the front door.pklongball (0 votes)
5 MayHere we can see a more normal stepped ceiling in the smaller guest bedroom.pklongball (0 votes)
5 MayAnother view of the living room ceiling that is partially completepklongball (0 votes)
5 MayThis part of the living room ceiling shows the 30 cm step from the lower to higher ceiling. The larger 30cm step was decided to allow install of the ceiling aircon unit later.pklongball (0 votes)
5 MayThe ceiling boys were in today and they go more "rock" installed. Here we can see a square hole that will be a service access to the attic space.pklongball (0 votes)