8 MayThe beginning of the final wiring for the load centerpklongball (0 votes)
|
|
8 MayDelivery man checking the boxes of tilepklongball (0 votes)
|
|
8 MayDelivery man checking the boxes of tilepklongball (0 votes)
|
|
8 MayToday we had a delivery of the tile for the main bath, main floors and front balcony. We have Mrs PK and the delivery man checking the quantity and type of tile delivered. She has been a great manager for our team.pklongball (0 votes)
|
|
8 MayToday we had a delivery of the tile for the main bath, main floors and front balcony.pklongball (0 votes)
|
|
8 MayHere is a new thing. Wife decided she wanted a recessed area in the wall above the bed headboard to put items such as books, flowers , knick-knacks or whatever. So we had the crew saw cut out the area and this will be finished off in some nice way.pklongball (0 votes)
|
|
5 MayA view looking at the living room ceiling area and gridwork and some drywall.pklongball (0 votes)
|
|
5 MayThe septic tank is now half buried and the newly dug trench from the street comes to the drain box. I need to get them to be sure that no water from any drain line in the house can drain to the back of the land so some sort of blocking will have to be placed in the pipe thats heads and slopes to the back.pklongball (0 votes)
|
|
5 MayToday they finished the second trench down the side from the septic tank to the street drain. I hope tomorrow the pipe will be installed.pklongball (0 votes)
|
|
5 MayAnother view from under the veranda ceilingpklongball (0 votes)
|
|
5 MayMore of the ceiling work around the back veranda areapklongball (0 votes)
|
|
5 MayMore of the ceiling work around the back veranda areapklongball (0 votes)
|
|