happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > pklongball

Top rated - pklongball's Gallery
P5082197.JPG
8 MayThe back stairs are now built and waiting for the finishing touchpklongball00000
(0 votes)
P5082198.JPG
8 MayLong shot of the trench and drain workpklongball00000
(0 votes)
P5082199.JPG
8 MayThe labor crew was busy installing more drain tile and boxes.pklongball00000
(0 votes)
P5082190.JPG
8 MayMore wire. In order to have light and cooling, wire is necessary and it can be very confusing.pklongball00000
(0 votes)
P5082191.JPG
8 MayOne of the many boxes in the ceiling area that has several junctions.pklongball00000
(0 votes)
P5082192.JPG
8 MayOne of the many boxes in the ceiling area that has several junctions.pklongball00000
(0 votes)
P5082193.JPG
8 MayThe preparation work for the ceiling fan and downlights in the office area. That steel rod sticking out of the ceiling will be used to support the fan when installedpklongball00000
(0 votes)
P5082194.JPG
8 MayAnother view of the mass of electric wires being pulled and installed.pklongball00000
(0 votes)
P5082185.JPG
8 MayWe can see here a view of the half walls in the master bathroom. We thought this would be a nice feature to keep most of the water in the shower. Have not decided if a glass door will be bought. Most likely not until after I win the lottery.pklongball00000
(0 votes)
P5082186.JPG
8 MayLook close it's Sparky up in the rafters doing a dance. He spent several hours up there today and yesterday.pklongball00000
(0 votes)
P5082187.jpg
8 MayHere we have Sparky number 2 getting a length of flex conduit ready for install.pklongball00000
(0 votes)
P5082188.JPG
8 MayMore distant view of some of the myriad of wire being strung in the conduit and this will find its way down into the load centerpklongball00000
(0 votes)
838 files on 70 page(s) 40

Debug Info 
Debug Output: show / hide