|

Top rated - pklongball's Gallery |

9 May 2009Sparky and Sparky 2 have now prewired most of the house. The ceiling lights over the main entry and veranda are shown herepklongball     (0 votes)
|
|

8 MayAnother view of the ceiling area and the complex of raceway, wires and conduitspklongball     (0 votes)
|
|

8 MayMore conduit, raceway and wires. pklongball     (0 votes)
|
|

8 MayA shot looking down from just above the load center and where all the wires make the turn and head down to the breakers.pklongball     (0 votes)
|
|

8 MaySome of the many bags of mortar mix being used. The amount of cement and cement products used in one build is staggering.pklongball     (0 votes)
|
|

8 MayHere we have one of the boxes I popped the cover on to check Sparky's wiring and splicing and the proper use of the wire nuts I am paying for. I can say I am more than pleased at his work.pklongball     (0 votes)
|
|

8 MayHere we have one of the boxes I popped the cover on to check Sparky's wiring and splicing and the proper use of the wire nuts I am paying for. I can say I am more than pleased at his work.pklongball     (0 votes)
|
|

8 MayAnother view of another portion of the raceway. This is proving to be a great idea I thinkpklongball     (0 votes)
|
|

8 MayI climbed up a tall ladder today to inspect the wiring and stuff from close up. Here is one view of the raceway now with some wire.pklongball     (0 votes)
|
|

8 MayAn over head shot of the small bathroom and the now almost finished wall tiles. We decided today to add one more row on the top to make the ceiling a little higher. Finished height will be 2.75 meters.pklongball     (0 votes)
|
|

8 MayHere we can see the living room ceiling and the partially completed sheetrockingpklongball     (0 votes)
|
|

8 MayAnother view of the back stairway to the veranda.pklongball     (0 votes)
|
|
838 files on 70 page(s) |
 |
 |
 |
 |
 |
39 |  |
 |
 |
 |
|

|
|
|