18 MayHere we have a below ground level shot of the pipe trenchpklongball (0 votes)
18 MayA new view today. Sparky and helper dug the trench for the PE pipe today. More pics show the results of this.pklongball (0 votes)
18 MayMore trench on its way to the housepklongball (0 votes)
18 MayThe tilemen have moved out to the back veranda over the weekend and have most of the floor done now on Mondaypklongball (0 votes)
18 MayMore of the tile application to the back veranda floorpklongball (0 votes)
18 MayANother view of the new tilepklongball (0 votes)
11 MayA more distant shot of the cabling installed for the 3 phase power and meter. The closer pole is the pole we installed for our connection. The pole opposite is the project installed pole. We had to have the cabling and pvc installed to get ready for the new meter in a month or two.pklongball (0 votes)
11 MayA not to close view of the newly installed cabling for the 3-phase hookup we will have in a month or two. Sparky called in the local PEA inspector to look over the house wiring and it just so happens that this guy also moonlights installing pre-meter install wiring. So now we have this covered and when the main connect is need we already have his approval so one step closer to having power.pklongball (0 votes)
11 MayHere we have Tileman 2 installing the wall tile in the master bath. Tileman 1 is in another spot of the room. The Thai method of tile installing is like nothing I have ever seen before but they get the job done.pklongball (0 votes)
9 May 2009The end of the drains dump the grey water into the street storm drains to be carried away to who knows where. Most likely into the nearest creek and then to the sea.pklongball (0 votes)
9 May 2009The drain pipe man is sighting down a line from the street to the septic tank. They added this piping today.pklongball (0 votes)
9 May 2009More of Sparky's handi-workpklongball (0 votes)