23 May 2009The readied trim boxes that await their final place on the upper outer ceiling area of the verandapklongball (0 votes)
23 May 2009Carpenter number 2 drilling pilot holes into the wood frame for the outside veranda trim. pklongball (0 votes)
23 May 2009The prep work and first paint applied to the back gablespklongball (0 votes)
20 MayHere we have two of the large cans of paint being applied. This is the white primer.pklongball (0 votes)
22 MayThe second view of the black tile layout for the stairs. Not so cute from this angle as the tile are just sitting sort of randomly at this point.pklongball (0 votes)
22 MayThis photo and one more may look rather odd but wifey and I decided to add something to the back steps when they apply the final sand wash. So we bought a box of 4 inch square tiles to add to the layer of sand wash. This is our attempt as to how we want them placed and the spacing. We feel it will look pretty goodpklongball (0 votes)
23 May 2009This old guy has worked for the builder for quite some time. He does most of the wood work. In this shot he's working on their table saw cutting some wood for the trim they are building for the front veranda.pklongball (0 votes)
23 May 2009The front door frame has been cleaned and sanded a bit and a coat of stain has been applied. All wood door frames got this treatment today.pklongball (0 votes)
20 MayThe ceiling "mud" man. The 2 bathrooms are the last to be finished.pklongball (0 votes)
20 MayMore of the finished ceiling just before paintingpklongball (0 votes)
20 MayThe now finished ceiling just before the primer and main paintingpklongball (0 votes)
20 MayTwo of the paint crew. These folks are sanding smooth the walls after an application of a skim coat to the rendered walls. This is the final sanding before painting.pklongball (0 votes)