June 8One of the built-in crew do some wood workingpklongball (0 votes)
June 8This guy stood on this ladder like this for at least 20 minutes trying to snake an electric cable down behind the cabinet to the place where a lite will be locatedpklongball (0 votes)
June 10Work has moved to the point of the almost finished look for the window. These panels will be a double bi-fold to each side to allow the opening.pklongball (0 votes)
June 10All the base and wall units are installed now and the work moves to finishing the doors and suchpklongball (0 votes)
June 7More of the crew adding the sand wash to the rear stepspklongball (0 votes)
June 7A different angle but the same day and more of the same sand wash stepspklongball (0 votes)
June 7The cabinet folks are also adding the finishing touches to the pass through window in the kitchen. pklongball (0 votes)
June 8This may seem like an odd view of the front doors but when hardware shopping I needed to show this to the guy so he knew the type of edges of the door halvespklongball (0 votes)
June 6The work in the kitchen is moving along and now the sink base is in place along with the wall units oven the HOB areapklongball (0 votes)
June 6Looking to the wall units for the exhaust hood and oven/microwavepklongball (0 votes)
June 7Today the wall crew came around to render the unfinished areas under the balconies that were not complete beforepklongball (0 votes)