June 14Underside view of the new stainless gutter installed a few days ago. Now the gutter is primed and ready for the color to match the eavespklongball (0 votes)
June 14Kitchen window frame above the new counter built inpklongball (0 votes)
June 14This is a view of the pumphouse construction today.pklongball (0 votes)
June 14Today I decided to shoot a few pics of the window frames before the installation of the windows. This is the second bedroom area.pklongball (0 votes)
June 14View of the window frames in living room areapklongball (0 votes)
June 14Here we have today's view into the master bath and the shower zone with the built in bench added for sitting down and enjoying a relaxing shower. A shower unit will be installed near this benchpklongball (0 votes)
June 14Opposite side of the shower zone and the cut out in the wall that will allow storage of any personal items for showeringpklongball (0 votes)
June 12The front as it looks today and the guttering around the eave line. Can you see it?pklongball (0 votes)
June 12We decided to install a rain gutter to the roof line around the read veranda. Huge amounts of rain came off this roof and down the long valley. It is stainless steel and has been painted with a primer so we can match the trim colorpklongball (0 votes)
June 12Just off the balcony the crew added to drain boxes to channel rain water from the roof and the kitchen drain out to the sewer systempklongball (0 votes)
June 12Today's view of the back of the house and the new guttering around the veranda eaves. Once it is painted it will almost be invisiblepklongball (0 votes)
June 12Some of the roof steel is up for the Pump house roofpklongball (0 votes)