happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > pklongball

Top rated - pklongball's Gallery
P6222453.JPG
June 22Today the painting crew started the inside paint. Before they began they used some masking tape to protect the wood. I don't know how well the tape shows in the photos here and other pagespklongball00000
(0 votes)
P6222444.JPG
June 22The cabinet with the Homewood doors in place. We decided on these to make the install easier. We are leaving the bottom of the gas bottle area open to allow and LPG that could possibly leak out to vent out there. As I recall the gas is heavier than air and will sink to the bottom of the cabinet.pklongball00000
(0 votes)
P6222445.JPG
June 22The outdoor cabinet for the shoes and the gas bottles now is almost finishedpklongball00000
(0 votes)
P6222446.JPG
June 22From the veranda the view of the pump room and waitng for the tile and floorpklongball00000
(0 votes)
P6222447.JPG
June 22The cabinet man came out yesterday to cut the openings for the HOB and the sink. They enede up removing one interior partition as the sink is bigger than they planned. Or should I say did not plan. They had pictures and drawings of the exact sink we bought and the last 3 weeks we had the sink but they still built the base for the sink too small, plus its not centered on the window as I asked.pklongball00000
(0 votes)
P6222448.JPG
June 22Today's view of the cabinets waiting now for the wall painting and tiling.pklongball00000
(0 votes)
P6222439.JPG
June 22Inside of the walk in gate area showing the gray plastic conduits for the lightspklongball00000
(0 votes)
P6222440.JPG
June 22Front wall view. We decided to have the land developer build his "free" included wall rather than pay for one now as the budget is getting tight. We did add the walk-in gate and widen the drive in one meter.pklongball00000
(0 votes)
P6222441.JPG
June 22The view today. Roof steel on and painted, tile waiting to install and one wall completedpklongball00000
(0 votes)
P6222442.JPG
June 22Here we have the 2 pieces of granite for the cabinet tops in the kitchen. Tile man will be doinf the work.pklongball00000
(0 votes)
P6222443.JPG
June 22A quick view of the front and the wood rails that are installed now. One small section on the right side of the steps will complete the front.pklongball00000
(0 votes)
P6152435.JPG
June 15We have the post and rails now we need some spokespklongball00000
(0 votes)
838 files on 70 page(s) 26

Debug Info 
Debug Output: show / hide