Top rated - pklongball's Gallery |
June 26View of the yellow wall that will be behind the fridge in a few weekspklongball (1 votes)
|
|
June 14The master bedroom and office area window framespklongball (1 votes)
|
|
27 MayAnother shot of the wood trimpklongball (1 votes)
|
|
11 March 2009More block to be installedpklongball (1 votes)
|
|
1 AprilSome more of the electricians handiwork. All the boxes he installed today come up the wall and join the raceway above the kitchen ceiling.pklongball (2 votes)
|
|
9 March 2009This is the beginning of the wall work. Nothing dramatic yet but needs to be done. Two ladies were assigned the job of moving the 2,000 odd blocks onto the floor area in selected places to make them ready for the wall team to start installing them.pklongball (1 votes)
|
|
July 9Sparky hard at it wiring up the load center.pklongball (1 votes)
|
|
June 3More of the cabinet install. Looking here at the bas cabinets for the cooking HOB and the Oven and Microwave cabinetpklongball (1 votes)
|
|
1 AprilHere we have one of the roof valleys after it's finished. Nice looking job of cutting and fitting the tilespklongball (1 votes)
|
|
6 March 09'Today the Q-Con blocks were delivered to the site. Total on the truck was 2,000 blocks. The walls will begin soon.pklongball (2 votes)
|
|
|
|