July 7The main room fan has this rotary control switch instead of the pull chain on the fanpklongball (0 votes)
July 7Master bedroom fan unit in placepklongball (0 votes)
July 6Side of the house after the rain last night. More standing water but not too bad herepklongball (0 votes)
July 7Two down lights will light the sidewalk to the back steps.pklongball (0 votes)
July 7Another of the down lights at the top of the front stepspklongball (0 votes)
July 7Sparky has installed most of the lights now. Here we have the main room chandelierpklongball (0 votes)
July 1The finishing stages of placing the driveway curbingpklongball (0 votes)
July 6We had a pretty heavy rain overnight and this is the stading water from that storm. We will need to re-grade this area to drain a bit better. Tractor man promised us some available time yet.pklongball (0 votes)
July 6Double width pad area for the two compressorspklongball (0 votes)
July 6Compressor and electric wiring for the guest bedroom AC and the living room ACpklongball (0 votes)
July 6Outdoor location of the master bedroom AC compressor. This spot will be filled with concrete for the pad areapklongball (0 votes)
June 30The delivery of the curbing for the driveway. 105 each of the 50 cm long precast blockspklongball (0 votes)