July 9Today we were graced with the presence of the long awaited plumber. He is doing his thing and now the guest bath has all the valves and fixtures in placepklongball (1 votes)
21 March 2009Its hard to see in this photo but my interest is the aircon tubing and cables that we had installed today. Right now its kind of hanging out in nowhere until the wall gets built.pklongball (1 votes)
3 Feb 2009Some of the floor panels are now in place in the back area of the house.pklongball (1 votes)
House layoutThe plan calls for the house and car park and pool. We can only afford the house and carpark now. The pool will be added later depending on the economypklongball (1 votes)
Jan.30,2010Almost finished but this is the view of the piping both water and electric.pklongball (1 votes)
July 10An overview of the bath and shower todaypklongball (1 votes)
July 10Here we have the master bath shower unit installed. This is a Hang Co unit. Combo rain head and hand held sprayer.pklongball (1 votes)