IMG_1450a.jpg
Revarinished wood and laid new section.Woodwork on the large mirror assembly.dozer44444
(1 votes)
DSC05119.jpg
A shot of the finished house. (13-Aug-04)dozer44444
(1 votes)
IMG_3971~0.JPG
Location of Electrical Breaker PanelThis is the front right side of the house as you go in through the front door. Note the cluster of yellow PVC electrical conduit to the right of the glass blocks. This is where the electric breaker panel will be located.dozer44444
(1 votes)
IMG_3810.JPG
Power Point BoxThe power point box secured in place with cement.
dozer44444
(1 votes)
DSC03181.JPG
Interior WallThe start of the interior wall laying process. dozer44444
(1 votes)
IMG_3939.JPG
Oversize Cinderblock Laying ProceedsThe block laying proceeds on top of the second horizontal beam. Note the vertical vent PVC pipes extend upward through designated holes in the blocks.
dozer44444
(1 votes)
IMG_1995.jpg
Wood in RaftersHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozer44444
(1 votes)
IMG_3988_small.jpg
Main bathroomNot grouted yet1 commentskknaj44444
(1 votes)
IMG_3566.JPG
First delivery of cementThe first delivery of rebar and some concrete mix to site.
The "macro" is in the background ready to dig.
Max&Bee-in-CM44444
(1 votes)
P1302836.JPG
Jan.30,2010Almost finished but this is the view of the piping both water and electric.pklongball44444
(1 votes)
P7102612.JPG
July 10An overview of the bath and shower todaypklongball44444
(1 votes)
P7102614.JPG
July 10Here we have the master bath shower unit installed. This is a Hang Co unit. Combo rain head and hand held sprayer.pklongball44444
(1 votes)