happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
IM000569a.jpg
Shower wall of glass blocksThis is taken from our bedroom doorway looking through the closet into the bathroom. somdet00000
(0 votes)
IM000572.jpg
rendering the wallAfter taking an 8 day break, they did almost the entire wall in one day ( about 130 meters).somdet00000
(0 votes)
IM000568.jpg
roof tilesThese are CPAC Monier Zeason tiles. The color is Winter Gray. They cost 18 baht a piece. The apparent difference in size is just an optical illusion created by the height of the stacks of tiles.somdet00000
(0 votes)
IM000567.jpg
Getting thereAbout 90% of the shell is done. Next steps are tiles, plumbing and painting.somdet00000
(0 votes)
outdoor_livingroom_.JPG
Br,fast.And here Tintin is enjoying breakfast. (dry white bread with strawberry jam from the local 7/11 to calm an upsett stomach) tintin00000
(0 votes)
Badekar_.jpg
Home in Pattaya.Master bathroom with concrete bathtub. Strangely the tub always look dirty in pictures.tintin00000
(0 votes)
Bassengpumpe_.jpg
Home in Pattaya.Poolpump, filters etc. before it was built in. tintin00000
(0 votes)
utestuen_206.jpg
Dining Table.The table and chairs are teak, since they are outside in the moist air.tintin00000
(0 votes)
spisebord_.jpg
Kitchen.Dining table and view into the kitchen. Ther is a sliding door in the opening now.tintin00000
(0 votes)
kveldstemning2_125.jpg
Evening in Pattaya.Where i spend my lazytime.tintin00000
(0 votes)
IM000525.jpg
roof tilesThe roof went up in about three days while I was out of town. It's about 90% finished but we are waiting on more tiles.somdet00000
(0 votes)
IM000528.jpg
back porchsomdet00000
(0 votes)
7142 files on 596 page(s) 595

Debug Info 
Debug Output: show / hide