Interior Walls StartingStarting to lay block for the interior walls. Staircase to the second floor is behind worker and will eventually be covered with wooden steps.Rick B (0 votes)
|
|
Second Floor Columns CompletedThe upper columns are complete and installation of the outer block walls is underway using ProBlock. Detached garage is under construction in front of the house.Rick B (0 votes)
|
|
Kitchen Before WindowsProBlock (similar to SuperBlock and sold by HomeMart) on outer wall and opening ready for installation of window frame.Rick B (0 votes)
|
|
entrancei'm not sure i did me sums right, perhaps i should buy an artic lorry to justify the entrance. (5m) ;+)mikey3073 (0 votes)
|
|
finished inside viewoh dear, that's gonna be a lorra gardeningmikey3073 (0 votes)
|
|
finished viewlooks ok from a distance ;-omikey3073 (0 votes)
|
|
Second floor beams after being poured looking at the back of the house (on left) and the side deck (on right). Note, the columns without second floor beams are single-storey columns and will support the lower roof sections over the side deck and the Thai kitchen in the rear.Rick B (0 votes)
|
|
Floor slabs being laid over first floor beams. The 6mm rebar seen embedded into the floor beams will be bent over the floor slabs and tied to the wire mesh laid over the floor slabs prior to pouring an additional 5cm of concrete on top of the floor slabs. This makes the finished floor ~ 10cm thick.Rick B (0 votes)
|
|
Floor slabs (pan peun) are being laid for the first floor. These slabs will be covered with wire mesh and an additional 5cm of poured concrete.Rick B (0 votes)
|
|
Rebar and forms for the second floor beams are bing assembled.Rick B (0 votes)
|
|
First floor columns' forms are being assembled after the floor beams were completed.Rick B (0 votes)
|
|
First floor beams are ready for the floor slabs (pan peun)Rick B (0 votes)
|
|