P3191882.JPG
19 March 2009The bedroom wall looking onto the rear patio area and it's prepared for the lintel. You can also see some of the pvc work for plugs and suchpklongball00000
(0 votes)
P3191883.JPG
19 March 2009Here we have a wall view of the master bedroom wall and preparations to make the concrete lintel. The method for any wall lintel is to shape the AAC blocks into small pieces and glue them into the cavity to allow poring of concrete for the beam.pklongball00000
(0 votes)
P3191884.JPG
19 March 2009Here we have a view of part of a wall and the pvc electric pipe install. This wall happens to be near the back of house that will have a window to look on the back yardpklongball00000
(0 votes)
P3191878.JPG
19 March 2009This is a front view at about 4 in the afternoon. The roof tile crew did a nice days work.pklongball00000
(0 votes)
P3191879.JPG
19 March 2009So we had a good bit of work on the tile today. I would say about 3 days should get the majority of tile in place.pklongball00000
(0 votes)
P3171875.JPG
17 March 2009The wall work, roof tile work and electric pipe work all going on at the same time.pklongball00000
(0 votes)
P3171876.JPG
17 March 2009The view today March 17. happy St Patty's Daypklongball00000
(0 votes)
P3161870.JPG
16 March 2009Here we are looking from the master bedroom entry door into what will be the dressing area of the master bedroom.pklongball00000
(0 votes)
P3161871.JPG
16 March 2009The very early stage of the wall build. This view is from the master bedroom looking through what will be a window across the balcony to the kitchen door.pklongball00000
(0 votes)
P3161872.JPG
16 March 2009Soon this stack of tile will be on the roof.pklongball00000
(0 votes)
P3171873.JPG
17 March 2009Sparky and helper installing a pipe and boxpklongball00000
(0 votes)
P3171874.JPG
17 March 2009The wall building is interrupted to allow the electrician "Sparky" and helper to install the boxes and conduits for the plugs and switches inside the wall cavity. From now til the Sparky finishes this part they will work together. We can also see the roof crew is moving tiles to the roof area for installation.pklongball00000